New runway sweeper from Norway at Queenstown Airport
Queenstown, New Zealand, 2017-May-24 — /Travel PR News/ — None of our team are shy of getting on a shovel on snow days and we have plenty of weapons in our arsenal to proactively and reactively keep the runway clear and the terminal operational.
New this year is a runway sweeper which is arriving from Norway in early June and is designed to clear 230,00sqm of surface area per hour (our runway is 85,000sqm). The blade on the front will clear snow to the side and the sweeper on the back will clean the runway. Then Helga, our monster snowblower which is capable of shifting 2,700 tonnes of snow per hour, will follow and disperse the pile of snow.
We also have a new vehicle which will allow airlines to de-ice their aircraft at the gate rather than being towed to the taxiway area.
Other options include:
Contact:
+64 (3) 450 9031
Source: Queenstown Airport
###
Welgevonden Game Reserve, South Africa, 2026-Mar-01 — /Travel PR News/ — Travel Promoters is delighted…
(IN SHORT) Jewel Changi Airport has revealed the winners of its inaugural Fans’ Favourites Awards,…
(NEWS) MADRID, Spain, 2026-Feb-27 — /Travel PR News/ — UN Tourism has launched the application process…
(IN SHORT) Condor will move its Frankfurt Airport operations to Terminal 3 starting in summer…
(IN SHORT) Korean Air reduced aircraft carbon emissions by more than 420,000 tons in 2025,…
(IN SHORT) HMSHost has signed a 12-year contract extension at Miami International Airport, ensuring the…