CLT Airport opens parts of Terminal Lobby Expansion’s west side to passengers

CLT Airport opens parts of Terminal Lobby Expansion’s west side to passengers

Charlotte, North Carolina, 2022-Jul-28 — /Travel PR News/ — CLT opened portions of the Terminal Lobby Expansion’s (TLE) west side this morning. It is the first TLE phase to debut to passengers.

The addition is a sneak peek of the overall look of the TLE project that will have large, picturesque windows, terrazzo flooring throughout, bright blue tiles framing the entrances/exits and architectural-detailed ceilings.

“This is a big moment for us,” said CLT’s Chief Operating Officer Jack Christine. “Opening this piece of the project allows us to not only continue finishing the expansion of the east side of the lobby, but also allows us to start the renovation phases of the project and stay on target to complete the entire TLE in 2025.”

The expansion’s west side provides:

  • Approximately 90,000 square feet of additional circulation space
  • Access to the west subterranean walkway. Located on the Hourly Deck’s first floor, the tunnel offers a traffic-free, covered walking path from the deck to the terminal.
  • Three new art pieces – “Meridian” by Danielle Roney, “Carolina Moon” by Scott Parsons and “Restless Sky” by Catherine Widgery
  • Twenty of CLT’s signature white rocking chairs in Arrivals/Baggage Claim
  • Thirty new Flight Information Display (FIDS) monitors

The Terminal Lobby Expansion is part of Destination CLT, the Airport’s $3.1 billion capital investment program that includes concourse renovations and expansion of CLT’s roadways, curb front, the airfield and terminal.

As passengers approach the Airport, they can use the following three new entrances/exits:

  • Door 2 on Arrivals/Baggage Claim level
  • Doors 1 and 2 on the Departures/Ticketing level

Upon entering the terminal’s upper or lower levels, ticket counters, security checkpoints and luggage carousels are not immediately visible. Signage has been installed to point customers in the right direction. Airport employees are stationed in Arrivals/Baggage Claim and Departures/Ticketing this week to assist with wayfinding as well.

The entire lobby expansion will wrap up in 2025. Customer amenities will include modern ticket counters, eight original artworks, charging stations, three large security checkpoints and five pre-security concession spaces. The $608 million signature TLE project will transform the Airport’s entrance with 366,000 square feet of new and renovated space, along with a 146,000-square-foot stunning canopy that will begin construction in September.

“The completed Terminal Lobby Expansion will be spectacular,” Christine said. “It will be modern, spacious, filled with natural light and worth the wait. Our passengers will definitely be impressed.”

Source: Charlotte Douglas International Airport

###

Travel PR News Editor

Recent Posts

On the Beach Partners with Ryanair for Low Fare Flight Packages

RYANAIR’S LOW FARE FLIGHTS NOW AVAILABLE TO BOOK AS PART OF ON THE BEACH PACKAGE HOLIDAYS…

3 hours ago

Hyatt Introduces Yada Xishan Hotel Yixing: A Serene Retreat in the Heart of Jiangnan

Blending natural beauty with contemporary Chinese aesthetics, the spiritual hideaway invites guests to enjoy elevated…

4 hours ago

A journey to Mauritius: Pristine Beaches and Rich Culture

Mauritius, 2024-May-3 — /Travel PR News/ — Mauritius offers a unique blend of relaxation, adventure,…

9 hours ago

Four Wheel Drive India Pvt. Ltd. Announces Exclusive Discounts on Golden Triangle India Tour Packages for Groups

Jaipur, India, 2024-May-3 — /Travel PR News/ — Four Wheel Drive India Pvt. Ltd., a…

9 hours ago

This website uses cookies.